Which measure to use
Simple payback suits quick screening. Discounted payback and NPV account for the cost of capital, so projects with long lives and steady savings, such as insulation, look better than their simple payback suggests. A positive NPV at your discount rate means the project earns more than that rate; the IRR is the rate at which NPV is zero. Include changes in maintenance and the gradual loss of savings as equipment ages or settings drift.
Assumptions and limits
- Savings arrive at the end of each year; investment at the start.
- No residual value, tax effects or incentives unless you net them into the investment.
References
- Brealey, R. A., Myers, S. C. and Allen, F., Principles of Corporate Finance, McGraw-Hill (net present value, IRR and payback).
- US DOE Federal Energy Management Program, Life-Cycle Cost Analysis (NIST Handbook 135).
Questions
- What do the example figures give?
- A 50,000 project saving 80,000 kWh at 0.12 per kWh, less 500 of extra maintenance, saves 9,100 in year 1: a simple payback of 5.5 years, discounted payback of 6.3 years, NPV of 53,571 at 6% over 15 years and an IRR of 18.8%.
- Why is discounted payback longer than simple payback?
- Later savings are worth less today at the discount rate, so it takes longer for their present value to repay the investment.
Results depend on the figures and factors you enter and on the assumptions listed above. Use the factor set your reporting scheme requires. Read the disclaimer.