Production and Capacity calculators
Capacity and utilization, OEE, takt time, line balancing and learning curves.
- Capacity Utilization and Efficiency Calculator (and Machines Needed)
Calculate capacity utilization (output against design capacity) and efficiency (output against effective capacity), or the number of machines or work centres needed for a demand from standard times and available hours.
- Learning Curve Calculator (Unit and Cumulative Average Models)
Estimate the time or cost of the nth unit, the cumulative total and the average per unit on a learning curve such as 80%, with the unit (Crawford) or cumulative average (Wright) model.
- Line Balancing Calculator (Ranked Positional Weight Method)
Assign assembly tasks with their times and predecessors to workstations for a given cycle time using the ranked positional weight heuristic, with the number of stations, the theoretical minimum, line efficiency and idle time.
- OEE Calculator (Overall Equipment Effectiveness)
Calculate overall equipment effectiveness from a shift's planned time, downtime, ideal cycle time and good and rejected counts, with availability, performance and quality and the time lost to each.
- Takt Time Calculator (with Operators or Stations Needed)
Calculate takt time, the pace of production that matches customer demand, from the available working time and daily demand, with a planned cycle time and the minimum number of operators or stations for the work content.