How the method works
Each task gets a positional weight: its own time plus the time of every task that must follow it, so tasks that hold up much of the line come first. Tasks are then placed in weight order into the current station whenever all their predecessors are already placed and the task still fits within the cycle time; when nothing more fits, a new station opens. The theoretical minimum, total work divided by cycle time and rounded up, is a lower bound: if the method reaches it the balance is optimal, otherwise another assignment might save a station.
Assumptions and limits
- Task times are fixed and no task is longer than the cycle time.
- One product on a straight, paced line; no parallel stations or zoning constraints.
References
- Helgeson, W. B. and Birnie, D. P., Assembly line balancing using the ranked positional weight technique, Journal of Industrial Engineering 12(6), 394–398, 1961.
- Heizer, J., Render, B. and Munson, C., Operations Management: Sustainability and Supply Chain Management, 13th ed., Pearson, 2020 (Chapter 9, assembly-line balancing).
Questions
- How are the ten example tasks (205 seconds of work) balanced for a 60-second cycle?
- In 4 stations, the theoretical minimum: A B C (60 s), D E (40 s), F H (55 s) and G I J (50 s), for a line efficiency of 85.4%.
- What happens with a 45-second cycle?
- The method uses 6 stations against a theoretical minimum of 5 (75.9% efficiency). Five stations are possible here (A C, B D, E F, G H, I J), which shows that a heuristic does not always find the best balance.
Results depend on the figures you enter and on the assumptions listed above. Check carrier tariffs, contracts and customs rulings before relying on them. Read the disclaimer.