Leaching Requirement Calculator (Irrigation Water Salinity)

Irrigation water always carries some salt. Unless extra water drains through the root zone, the salt builds up until yields fall. The leaching requirement is the fraction of applied water that must pass below the roots to keep soil salinity at a level the crop tolerates.

Results are estimates. Follow local agronomy advice and product labels.

Inputs

%
%

Results

Leaching requirement
16.44%
Soil salinity allowed (ECe)
1.7
Total water to apply
718
Extra water for leaching
118

    RefAGR-IRR-008
    MethodLR = ECw ÷ (5·ECe − ECw) (FAO-29); drip: LR = ECw ÷ (2·max ECe); applied water = ET ÷ (1 − LR)
    UnitsSI
    Date2026-11-24

    Working

    Calculated in SI base units; inputs are converted from the units you choose.

    1. Soil salinity for the target yieldECe = threshold + (100 − Y) ÷ slopeECe = 1.7 + (100 − 100) ÷ 12 = 1.7 dS/m
    2. Leaching requirementLR = ECw ÷ (5·ECe − ECw)LR = 1.2 ÷ (5 × 1.7 − 1.2) = 16.44%
    3. Water to applyAW = ET ÷ (1 − LR)AW = 600 ÷ (1 − 0.1644) = 718 mm, of which 118 mm leaches salts

    Salt tolerance and the leaching fraction

    Maas and Hoffman (1977) described crop salt tolerance by a threshold soil salinity (ECe of the saturated paste extract) above which yield falls linearly with a given slope. FAO Irrigation and Drainage Paper 29 combines that with the water salinity ECw in LR = ECw ÷ (5·ECe − ECw) for surface and sprinkler irrigation. With frequent drip irrigation the root zone stays wetter and the paper gives LR = ECw ÷ (2·max ECe). The extra water must actually drain: on poorly drained land it raises the water table instead.

    Assumptions and limits

    • Steady state over the season; rainfall leaching is not counted.
    • Salinity expressed as electrical conductivity at 25 °C.

    References

    • Ayers, R. S. and Westcot, D. W., Water Quality for Agriculture, FAO Irrigation and Drainage Paper 29 Rev. 1, FAO, Rome, 1985.
    • Maas, E. V. and Hoffman, G. J., Crop salt tolerance: current assessment, Journal of the Irrigation and Drainage Division, ASCE 103 (1977) 115–134.

    Questions

    What leaching requirement does maize need with 1.2 dS/m water?
    For full yield (ECe 1.7 dS/m) LR = 1.2 ÷ (5 × 1.7 − 1.2) = 16.4%, so a 600 mm crop need becomes about 718 mm of irrigation.
    How do I convert µS/cm to dS/m?
    Divide by 1,000: 1,200 µS/cm is 1.2 dS/m, which is the same as 1.2 mS/cm or 1.2 mmho/cm.

    Results depend on the figures you enter and on the assumptions listed above; field, animal and product conditions vary. Read the disclaimer.