Order Picking Labor Calculator (Pickers Needed from Pick Rate)

Order picking is usually the largest labor cost in a warehouse. Given the daily orders and a realistic pick rate, this calculator works out the picker-hours and the number of pickers needed, and what the labor costs per order and per line.

Inputs

%
$
Advanced options (1)

Results

Pickers needed
8
Lines per day
4,200
Units per day
7,560
Picking hours needed
52.5
Labor cost per day
$1,152.00
Labor cost per order
$0.96
Labor cost per line
$0.27
Pick rate needed with the pickers available
102.9
  • Size for the busy days and hours, not the average: order volumes peak by weekday and season, and cut-off times compress the work.

RefOPS-WHS-004
MethodLines = orders × lines per order; picker-hours = lines ÷ pick rate; pickers = picker-hours ÷ (shift hours × productive share)
CurrencyUSD
Date2026-11-24

Working

Money amounts are plain numbers shown in the currency chosen at the top of the page (symbol only; nothing is converted and no exchange rates are used).

  1. Workloadorders × lines per order1,200 × 3.5 = 4,200 lines (7,560 units)
  2. Picking hourslines ÷ pick rate4,200 ÷ 80 = 52.5 hours
  3. Pickershours ÷ (paid hours × productive share)52.5 ÷ (8 × 85%) = 7.721 → 8 pickers
  4. Costpickers × paid hours × cost per hour8 × 8 × $18.00 = $1,152.00 a day, $0.96 an order
  5. With the team availablelines ÷ (pickers × paid hours × productive share)4,200 ÷ (6 × 8 × 85%) = 102.9 lines an hour each

Pick rates and productive time

Use a pick rate measured over whole hours of picking, which includes walking or driving between locations, finding the item, scanning and packing it into the tote. Travel is commonly the largest part of a picker's time, so batching orders, zoning and slotting fast movers near the dispatch area raise the rate more than working faster. Paid hours are not all productive: breaks, briefings, start-up, replenishment and other indirect tasks take a share, entered here as the productive share.

Assumptions and limits

  • Workload measured in order lines; the pick rate already includes travel.
  • Work spread evenly across the paid hours; the count is rounded up to whole pickers.

References

  • Frazelle, E. H., World-Class Warehousing and Material Handling, 2nd ed., McGraw-Hill, 2016.
  • Bartholdi, J. J. and Hackman, S. T., Warehouse & Distribution Science, Georgia Institute of Technology (online text).

Questions

How many pickers do 1,200 orders of 3.5 lines need at 80 lines an hour?
8 pickers: 4,200 lines take 52.5 picking hours, and an 8-hour day at 85% productive time gives 6.8 hours each (7.7 pickers, rounded up).
What does picking cost per order at 18 an hour?
About 0.96 an order: 8 pickers × 8 hours × 18 = 1,152 a day for 1,200 orders, or 0.27 a line.

Results depend on the figures you enter and on the assumptions listed above. Check carrier tariffs, contracts and customs rulings before relying on them. Read the disclaimer.