Peaks and utilization
Trucks do not arrive evenly over the day, so the average hourly rate is scaled up by a peak-hour factor. Each truck holds a door for its whole dwell time, from docking to departure, which converts trucks per hour into door-hours per hour. Running doors close to 100% busy produces queues, because arrivals vary, so a target utilization below 100% leaves headroom. A booking system that spreads arrivals lowers the peak factor and the doors needed.
Assumptions and limits
- Separate receiving and shipping doors; truck dwell times as averages.
- Peak factor and utilization target chosen by the user.
References
- Tompkins, J. A., White, J. A., Bozer, Y. A. and Tanchoco, J. M. A., Facilities Planning, 4th ed., Wiley, 2010 (receiving and shipping docks).
- Frazelle, E. H., World-Class Warehousing and Material Handling, 2nd ed., McGraw-Hill, 2016.
Questions
- How many doors for 24 inbound trucks (60 minutes each) and 16 outbound (45 minutes) over 16 hours?
- 5 doors with a 1.5 peak factor and 80% utilization: 3 for receiving (2.25 door-hours an hour in the peak) and 2 for shipping (1.13).
- What if arrivals were booked evenly (peak factor 1)?
- 3 doors: 2 for receiving and 1 for shipping.
Results depend on the figures you enter and on the assumptions listed above. Check carrier tariffs, contracts and customs rulings before relying on them. Read the disclaimer.