Which variability to include
When only demand varies, the standard deviation of demand over the lead time is σd × √L. When the lead time varies as well, the two effects combine as √(L·σd² + d²·σL²), and lead-time variability often dominates: in the example two days of lead-time spread add far more stock than the daily demand swings. The cycle service level is the chance of not running out in a replenishment cycle; it is not the fill rate (the share of demand met from stock), which is usually higher. Safety stock rises steeply near 100%, as the table shows.
Assumptions and limits
- Continuous review; daily demand and lead time independent and approximately normal.
- Demand and its standard deviation are per day, matching the lead time in days.
References
- Chopra, S. and Meindl, P., Supply Chain Management: Strategy, Planning, and Operation, 6th ed., Pearson, 2016 (Chapter 12, safety inventory with uncertain demand and lead time).
- Silver, E. A., Pyke, D. F. and Thomas, D. J., Inventory and Production Management in Supply Chains, 4th ed., CRC Press, 2017.
Questions
- What safety stock covers 120 units a day (σ 30) and a 10-day lead time (σ 2 days) at 95%?
- About 424 units. The spread of lead-time demand is √(10 × 30² + 120² × 2²) = 258 units, times z = 1.645. The reorder point is about 1,624 units.
- How much of that comes from lead-time variability?
- Most of it: with demand variability alone the safety stock would be 156 units (1.645 × 30 × √10); with lead-time variability alone, 395 units.
Results depend on the figures you enter and on the assumptions listed above. Check carrier tariffs, contracts and customs rulings before relying on them. Read the disclaimer.