EOQ Calculator (Economic Order Quantity)

The economic order quantity is the order size that minimises the sum of ordering costs, which fall as orders get bigger, and holding costs, which rise. It is the classic starting point for deciding how much stock to order at a time.

Inputs

$
$
$
Advanced options (1)

Results

Economic order quantity
200
Orders a year
5
Working days between orders
50
Annual ordering cost
$50.00
Annual holding cost
$50.00
Annual ordering + holding cost
$100.00
Total annual cost including purchases
$5,100.00

    RefOPS-INV-001
    MethodEOQ = √(2DS ÷ H); annual cost = (D ÷ Q)·S + (Q ÷ 2)·H
    CurrencyUSD
    Date2026-11-24

    Working

    Money amounts are plain numbers shown in the currency chosen at the top of the page (symbol only; nothing is converted and no exchange rates are used).

    1. Economic order quantityQ* = √(2DS ÷ H)√(2 × 1,000 × $10.00 ÷ $0.50) = 200 units
    2. Orders and cycleN = D ÷ Q*; T = working days ÷ N5 orders a year, every 50 working days
    3. Annual costs(D ÷ Q)·S + (Q ÷ 2)·H$50.00 ordering + $50.00 holding = $100.00

    Cost of ordering more or less than the EOQ

    Order sizeUnitsOrdering costHolding costTotal% above minimum
    0.5 × EOQ100$100.00$25.00$125.0025
    0.75 × EOQ150$66.67$37.50$104.174.166666666666674
    1 × EOQ200$50.00$50.00$100.000
    1.25 × EOQ250$40.00$62.50$102.502.499999999999991
    1.5 × EOQ300$33.33$75.00$108.338.333333333333348
    2 × EOQ400$25.00$100.00$125.0025

    Using the EOQ

    At the EOQ the annual ordering cost equals the annual holding cost. The total cost curve is flat near the minimum: ordering 25% more or less than the EOQ raises the cost by only a few per cent, so round the quantity to a pack size, pallet or truckload freely. The holding cost should include the cost of capital tied up in stock, storage, insurance, damage and obsolescence, not just the warehouse rent. When suppliers offer lower prices for larger orders, use the quantity discount version.

    Assumptions and limits

    • Steady, known demand; the whole order arrives at once; no shortages.
    • Ordering cost per order and holding cost per unit are constant; no quantity discounts.

    References

    • Harris, F. W., How Many Parts to Make at Once, Factory, The Magazine of Management 10(2), 135–136 and 152, 1913.
    • Heizer, J., Render, B. and Munson, C., Operations Management: Sustainability and Supply Chain Management, 13th ed., Pearson, 2020 (Chapter 12, Inventory Management).
    • Silver, E. A., Pyke, D. F. and Thomas, D. J., Inventory and Production Management in Supply Chains, 4th ed., CRC Press, 2017.

    Questions

    What is the EOQ for 1,000 units a year, 10 per order and a holding cost of 0.50 per unit a year?
    200 units: five orders a year, one every 50 working days, with 50 of ordering cost and 50 of holding cost, 100 a year in total.
    What does ordering 400 at a time cost instead?
    125 a year (25 for ordering and 100 for holding), 25% more than at the EOQ.

    Results depend on the figures you enter and on the assumptions listed above. Check carrier tariffs, contracts and customs rulings before relying on them. Read the disclaimer.