Wastage
Allow 3 to 5 % for spillage, uneven subgrade and pump line losses on slabs, and more for small pours or excavated footings with rough sides. Ready-mix suppliers usually deliver in 0.25 or 0.5 m³ increments.
Assumptions and limits
- Uniform thickness; formwork does not deflect.
References
- ACI 304R, Guide for measuring, mixing, transporting and placing concrete.
Questions
- How much concrete for a 6 × 4 m slab 150 mm thick?
- 3.6 m³ net, or about 3.8 m³ (4.9 yd³) with 5 % wastage.
- How much does a cubic metre of concrete weigh?
- About 2.4 tonnes for plain concrete and 2.5 tonnes reinforced.
This calculator is a design aid. Check results against the governing code or standard and have critical work verified by a qualified engineer. Read the disclaimer.