Choosing the basis
Use the activity that best drives overhead: machine hours in automated plants, labor hours where work is manual. Over-absorption (absorbed more than incurred) usually comes from higher activity or lower spending than budgeted and is credited to profit; under-absorption is charged against it. Activity-based costing refines this further with several cost pools and drivers. In US texts the rate is often called the predetermined overhead (application) rate.
Assumptions and limits
- A single plant-wide rate set from the budget.
- Activity measured on the same basis for budget and actual.
- The difference is written off to profit for the period.
References
- Drury, C., Management and Cost Accounting, Cengage (absorption costing; overhead rates).
- Horngren, Datar and Rajan, Cost Accounting: A Managerial Emphasis, Pearson (job costing and budgeted indirect-cost rates).
Questions
- What is the rate if overhead of 450,000 is budgeted over 30,000 machine hours?
- 15.00 per machine hour. If 31,500 hours are actually worked and overhead turns out at 470,000, 472,500.00 is absorbed, so overhead is over-absorbed by 2,500.00.
- Why does over- or under-absorption happen?
- Because the rate is fixed in advance from budgets. Any difference in actual overhead spending or actual activity shows up as over- or under-absorption at the end of the period.
For information only, not financial, accounting or tax advice. Check figures with your accountant or adviser. Results depend on the figures you enter and on the assumptions listed above; lenders, banks and product providers may calculate differently. Read the disclaimer.